.

AV & ICT Design Engineering

Audio Visual &
ICT Infrastructure
by Independent AV and ICT design engineering consultants

We design the audiovisual and low voltage systems modern buildings run on.
01

Audio / Visual

Sound, video, lighting, display.
Audio / Visual
Conferencing, auditoriums, digital signage and command centers designed around how the room is actually used.
02

IP Networks

BICSI certified backbone design.
IP Networks
Backbone, wireless and distribution design coordinated with BAS, fire alarm and security systems.
03

Structured Cabling

Pathways and distribution.
Structured Cabling
Pathways, risers, racks and terminations documented to the component level so field crews never guess.
04

Construction Docs

Revit, AutoCAD, Division 27.
Construction Docs
Coordinated drawings, Division 27 specifications, bills of material and bid administration.
Why us

As trusted Independent AV and ICT design engineering consultants, we ensure top-tier solutions for your needs.

Senior consultants.
Concept to commissioning.

No hand-offs to entry level engineers. No hardware to sell you. Just design that builds cleanly.

2020

Founded

48

States served

0

Products sold
Certified
Dante Certified
Services

Four disciplines, one team

AV and Broadcast Systems Design

Collaborative conferencing: video, audio, web and data
Auditoriums, lecture halls and presentation rooms
Command and control centers, digital signage
Staged environments for concerts, corporate events, Sports and Entertainment facilities

ICT & Low Voltage Engineering

Structured cabling solutions and pathway design
BICSI certified IP network design
Coordination with BAS, fire alarm and security systems
Data Center, Telecommunications Rooms and Entrance Facility designs

Documentation & Specifications

AutoCAD and Revit coordinated drawings
Division 27 AV and low voltage specifications
Bill of Materials (BOM) development
Bid administration and vendor evaluation

Consultation & Project Management

Needs assessment and technology master planning
New construction, tenant improvement and MAC work
Peer review of AV and ICT designs by other professionals
Risk mitigation using real-time data from the field