Sound, video, lighting, display and projection systems engineered for the way each room is actually used.
Collaborative conferencing: video, audio, web and data
Auditoriums, lecture halls and presentation rooms
Command and control centers, digital signage
Staged environments for concerts, corporate events, Sports and Entertainment facilities
ICT & Low Voltage Engineering
The structured cabling and network backbone that modern communication depends on, coordinated to the component level.
Structured cabling solutions and pathway design
BICSI certified IP network design
Coordination with BAS, fire alarm and security systems
Data Center, Telecommunications Rooms and Entrance Facility designs
02
03
Documentation & Specifications
Construction-ready deliverables your design and construction team can build from without guesswork.
AutoCAD and Revit coordinated drawings
Division 27 AV and low voltage specifications
Bill of Materials (BOM) development
Bid administration and vendor evaluation
Consultation & Project Management
Senior consultants stay on your project from concept through final testing and commissioning.
Needs assessment and technology master planning
New construction, tenant improvement and MAC work
Peer review of AV and ICT designs by other professionals
Risk mitigation using real-time data from the field
04
Delivery methods
01
Design-Build
02
Design-Bid-Build
03
Two-Step Best Value Design-Build
04
Progressive Design-Build
FAQ
Questions we get early
At what stage of a project should we bring you in?
As early as the conceptual phase. Getting AV and ICT requirements into the drawings before pathways, power and ceiling coordination are locked avoids the most expensive changes later. That said, we regularly join projects mid-design and during construction administration.
Do you sell or install equipment?
No. We are an independent design engineering and consulting firm. Because we do not sell hardware, our bills of materials and specifications are written around what your project needs, not around a product line.
Which construction delivery methods do you work in?
Design-Build, Design-Bid-Build, Two-Step Best Value Design-Build and Progressive Design-Build.
Who will actually be working on our project?
Senior level consultants. We do not relegate projects to entry level engineers; the principals and senior consultants stay involved from concept through commissioning.
Where do you work?
Anywhere in the contiguous United States, from our base in Huntington Beach, California.