.
Skip to content
About
Services
Projects
Blog
Contact
Call 562-343-6014
About
Services
Projects
Blog
Contact
Call 562-343-6014
562-343-6014
Start a project
AVC Principles | AV & ICT Design Engineering Consultants
About
Services
Projects
Blog
Contact
Call 562-343-6014
About
Services
Projects
Blog
Contact
Call 562-343-6014
AV & ICT Design Engineering
Audio Visual &
ICT Infrastructure
We design the audiovisual and low voltage systems modern buildings run on.
Start a project
562-343-6014
01
Audio / Visual
Sound, video, lighting, display.
Audio / Visual
Conferencing, auditoriums, digital signage and command centers designed around how the room is actually used.
02
IP Networks
BICSI certified backbone design.
IP Networks
Backbone, wireless and distribution design coordinated with BAS, fire alarm and security systems.
03
Structured Cabling
Pathways and distribution.
Structured Cabling
Pathways, risers, racks and terminations documented to the component level so field crews never guess.
04
Construction Docs
Revit, AutoCAD, Division 27.
Construction Docs
Coordinated drawings, Division 27 specifications, bills of material and bid administration.
Why us
Senior consultants.
Concept to commissioning.
No hand-offs to entry level engineers. No hardware to sell you. Just design that builds cleanly.
2020
Founded
48
States served
0
Products sold
About the firm
Certified
Dante Certified
Services
Four disciplines, one team
All services
AV and Broadcast Systems Design
Collaborative conferencing: video, audio, web and data
Auditoriums, lecture halls and presentation rooms
Command and control centers, digital signage
Staged environments for concerts, corporate events, Sports and Entertainment facilities
ICT & Low Voltage Engineering
Structured cabling solutions and pathway design
BICSI certified IP network design
Coordination with BAS, fire alarm and security systems
Data Center, Telecommunications Rooms and Entrance Facility designs
Documentation & Specifications
AutoCAD and Revit coordinated drawings
Division 27 AV and low voltage specifications
Bill of Materials (BOM) development
Bid administration and vendor evaluation
Consultation & Project Management
Needs assessment and technology master planning
New construction, tenant improvement and MAC work
Peer review of AV and ICT designs by other professionals
Risk mitigation using real-time data from the field